Back to News
June 22, 2019

EDI 602

Rig mobilisation — UAE to Oman, 2000HP

June – August 2019: BLCS International executed the rig mobilisation of drilling rig 602 from UAE to Oman for a 2000HP onshore drilling installation — as part of an ongoing framework covering rigs 601 and 602.

The project included documentation preparation (packing lists, customs clearance documentation), cleaning, packing and labelling, dismantling of the rig, transportation by road, ocean freight, customs formalities at the destination port, final transport to the well site and assembly of the drilling rig on location.

BLCS International also carried out the dismantling and assembly of drilling rigs 601 and 602 for mobilisation and subsequent national rig moves within Bahrain, providing a continuous, integrated service for the client across multiple projects.